Lake Geneva, WI
Lakewood Baptist Church
Photo courtesy of Catalyst Construction
What we did
This project involved an expansion on the east side of the current church building. The expansion featured a single-story worship area, classrooms and a new entrance.
The original facility was equipped with a dry system. Blair Fire Protection was tasked with modifying the existing dry system and implementing an additional one to support the increased square footage.
GENERAL CONTRACTOR:
Catalyst Construction
ARCHITECT:
Excel Engineering
SQUARE FOOTAGE:
19,000 SF
COMPLETION:
June 2022