Brookfield, WI

Azura Memory Care & Assisted Living

Photo courtesy of Berghammer Construction

What we did

The new Azura Living campus consists of four distinct buildings, specifically designed to accommodate both memory care and assisted living residents. Of these, two buildings are allocated for memory care, while the other two serve the assisted living population.

Blair Fire Protection was contracted for all four facilities within this campus. Each building features a dry fire suppression system in the attic and a wet system on the first floor.

GENERAL CONTRACTOR:
Berghammer Construction

ARCHITECT:
Groth Design Group

SQUARE FOOTAGE:
67,750 SF (Total Campus)

APPOXIMATE VALUE:
$380,000

COMPLETION:
Fall, 2020

More Projects

Previous
Previous

Anitas Gardens